How to File a Chase Sapphire Trip Delay or Rental Car Claim
Step-by-step: how to file a Chase Sapphire trip delay claim and a rental car damage claim, with deadlines, phone numbers and the documents you'll need.
Key points
- Trip delay: the Sapphire Preferred pays up to $500 per traveler after a 12-hour delay or overnight stay; the Reserve after 6 hours.
- Start a trip delay claim within 60 days and send documents within 100 days, per AwardWallet.
- Rental car damage: start the claim within 100 days, return the form within 120 days and documents within 365 days, per NerdWallet.
- The airline's written statement of the delay and itemized receipts are the documents people most often forget.
Checked November 26, 2026. Coverage amounts from Chase's Sapphire Preferred and Reserve pages; claim steps and deadlines from AwardWallet (trip delay, updated April 8, 2026) and NerdWallet (rental cars, October 13, 2026). Your card's Guide to Benefits has the binding terms.
Chase Sapphire cards include trip delay and primary rental car coverage, but you only get paid if you file correctly and on time. Here's what to collect while you're still at the airport or rental counter, and how to file afterward.
Trip delay coverage at a glance
| Sapphire Preferred | Sapphire Reserve | |
|---|---|---|
| Delay before coverage starts | More than 12 hours, or an overnight stay | More than 6 hours, or an overnight stay |
| Maximum | $500 per covered traveler | $500 per ticket |
| What it pays for | Unreimbursed expenses such as meals and lodging | Same |
| How you paid | Fare charged to the card (at least in part) | Same |
Preferred terms are from Chase; Reserve terms are from One Mile at a Time. The delay has to be caused by a covered reason, such as weather, equipment problems or a strike; delays you knew about before leaving or caused by missing your flight aren't covered.
Step by step: filing a trip delay claim
- Get a statement from the airline before you leave the airport, or request one online. It should say why the flight was delayed, for how long and whether you needed an overnight stay.
- Keep itemized receipts for meals, hotel, transportation and essentials. AwardWallet notes you don't have to pay these with the Chase card.
- Start the claim within 60 days at chasecardbenefits.com or by calling the Benefit Administrator (the number is on the back of your card and in your Guide to Benefits).
- Send your documents within 100 days: - The signed claim form - Your card statement showing the fare (or proof of the card portion if you used points) - Your itinerary - The airline's delay statement - Itemized receipts
- Claim from the airline first if it offers meals or a hotel. Chase's coverage is secondary to anything the airline reimburses.
Know what the airline owes you, too: see flight delayed or canceled: what you're owed.
One email a week. The gear worth buying and the fares worth booking.
No affiliate padding. If we wouldn't recommend it to a friend, it doesn't go in.
Step by step: filing a rental car damage claim
Sapphire cards' rental coverage is primary: you don't need to claim through your own auto insurance first (New York residents get secondary coverage inside the US, per Chase). The Preferred covers up to $60,000 on most cars with an MSRP of $125,000 or less.
- At the counter: pay for the whole rental with your Sapphire card and decline the rental company's collision damage waiver.
- If something happens: get a police report for theft or a serious accident, take photos and get the rental company's damage report.
- Start the claim within 100 days online through Chase's claims site or by phone (NerdWallet lists 888-320-9961, or 804-673-1691 collect from abroad).
- Return the claim form within 120 days.
- Send supporting documents within 365 days. The benefit administrator tells you what it needs; keep copies of the rental agreement, the damage report, repair estimates or invoices, photos, any police report and your card statement so you're ready.
NerdWallet notes rentals longer than 31 days aren't covered, and neither are exotic and high-value cars, cargo vans, trucks other than pickups, motorcycles and large passenger vans. See rental car insurance for when you need other coverage.
Tips that save claims
- Photograph receipts right away. Itemized ones, not just card slips.
- Ask for the airline statement before leaving the airport. It's hardest to get later.
- Keep everything on the card. Coverage depends on paying for the fare or rental with your Sapphire card.
- Read your Guide to Benefits. It has the exact covered reasons and exclusions for your card.
Frequently asked questions
How long do I have to file a Chase trip delay claim? AwardWallet says to start the claim within 60 days of the delay and send all documents within 100 days.
Does Chase trip delay cover a 6-hour delay on the Sapphire Preferred? No. The Preferred requires a delay of more than 12 hours or an overnight stay. The Reserve starts at 6 hours.
Is Chase Sapphire rental car insurance primary? Yes, on both Sapphire cards, when you decline the rental company's collision waiver and pay with the card. For New York residents, it's secondary inside the US.
Do I need to pay for my hotel with the Chase card to claim trip delay? No. The fare must be on the card, but AwardWallet notes the expenses you claim don't have to be.
Related guides
- Credit card travel protections
- Card trip delay coverage vs. travel insurance
- What you're owed for a delayed bag
- Chase Sapphire Preferred review
Part of our travel money guide.
Sources
- Chase: Sapphire Preferred benefits page and terms; Sapphire Reserve benefits page (checked November 26, 2026)
- AwardWallet: How to file a flight delay claim with Chase (updated April 8, 2026)
- NerdWallet: Chase Sapphire Preferred rental car insurance guide (October 13, 2026)
- One Mile at a Time: Chase Sapphire Reserve review (Reserve trip delay terms)
What's changed: First published November 26, 2026.


